← All propulsion products

EcoPulse 100 kW turbogenerator

Safran Electrical & Power
View manufacturer company profile
Hybrid-electric systems
Documented propulsion or supporting hardware
Aircraft-specific 100 kW auxiliary turbine-generator source feeding EcoPulse distributed electric propulsion alongside battery.
Historical / demonstrator record; current availability and approval require verification.

Specifications and conditions

Evidence review status: Primary-source review; model and configuration limits retained.

Operating limits: Aircraft-specific 100 kW auxiliary turbine-generator source feeding EcoPulse distributed electric propulsion alongside battery. Supplied by Safran; distinct from GENeUS 300. Physical demonstrator flew and project ended December 2024. No certified production availability inferred.

Source conflicts / limitations: Primary documentation establishes electric-aircraft application or development. This is aviation-adjacent evidence, not a verified UAM installation. No missing value is treated as zero, no dielectric test voltage is treated as operating voltage, and no electrical input power is converted to shaft output.

Specification version / evidence: Original source linked below; reviewed 8 November 2026. Exact dated revision is noted above where established.

Aircraft applications

Primary documentation establishes electric-aircraft application or development. This is aviation-adjacent evidence, not a verified UAM installation. Aircraft-specific 100 kW auxiliary turbine-generator source feeding EcoPulse distributed electric propulsion alongside battery. Supplied by Safran; distinct from GENeUS 300. Physical demonstrator flew and project ended December 2024. No certified production availability inferred.

EcoPulse — source-specific configuration and development context.

Certification

See model-specific source and limitations. Special conditions, environmental tests, transport tests, supplier qualification claims and development milestones do not themselves establish an aircraft type certificate or approval of an exact installation.

Sources

Primary documentation. Reviewed 8 November 2026; scope and limitations above.

Primary documentation. Reviewed 8 November 2026; scope and limitations above.

Last verified

November 8, 2026

What changed?

Reviewed developments appear here when available. Browse news coverage and the certification tracker for further evidence.