← All propulsion products

CT7-based EPFD hybrid-electric powertrain

GE Aerospace
View manufacturer company profile
Hybrid-electric systems
Documented propulsion or supporting hardware
Megawatt-class research powertrain developed through NASA EPFD and flown on a modified Saab 340B. GE and BETA reported electrical assistance during takeoff in October 2026.
Flight-tested research demonstrator. GE and BETA reported hybrid-electric takeoff assistance.

Specifications and conditions

Evidence review status: Primary-source review; model and configuration limits retained.

Operating limits: Initially ground-tested integrated megawatt-class powertrain for NASA EPFD, comprising GE motor/generators, converters/inverters and controls with CT7, Avio Aero gearbox, Dowty propeller, BAE batteries and Aurora nacelle. Programme-specific descriptive name; no public supplier SKU or approved installed rating asserted.

Source conflicts / limitations: Primary documentation establishes electric-aircraft application or development. This is aviation-adjacent evidence, not a verified UAM installation. No missing value is treated as zero, no dielectric test voltage is treated as operating voltage, and no electrical input power is converted to shaft output.

Specification version / evidence: Original source linked below; reviewed 9 November 2026. Exact dated revision is noted above where established.

Operating limits: GE and BETA extended electrical assistance to takeoff in October 2026. Earlier tests used assist in climb and cruise. GE did not disclose the electrical contribution during takeoff or installed shaft output.

Aircraft applications

Modified Saab 340B with a conventional CT7 on the left and the EPFD-derived hybrid system on the right.

Certification

See model-specific source and limitations. Special conditions, environmental tests, transport tests, supplier qualification claims and development milestones do not themselves establish an aircraft type certificate or approval of an exact installation.

Sources

Primary documentation. Reviewed 8 November 2026; scope and limitations above.

GE Aerospace takeoff announcement, 4 November 2026. Aviation Week test chronology, 5 November 2026.

Last verified

November 9, 2026

What changed?

Reviewed developments appear here when available. Browse news coverage and the certification tracker for further evidence.