Evidence review status: Company-reported historical development evidence; no qualified numerical comparison points.
Energy / capacity: Pack energy, capacity, voltage and mass are not established by the reviewed releases.
Mass and system boundary: Proprietary aircraft battery pack, distinct from its cylindrical cells and the complete aircraft battery system.
Source conflicts / limitations: Archer reports thermal-runaway containment and drop testing. Its March 2024 release distinguishes those tests from future FAA for-credit tests. Planned line throughput is not actual production output or pack performance.
Specification version / evidence: Archer releases: 31 January, 28 March and 8 May 2024. Reviewed 7 November 2026.
Archer's 31 January 2024 release reports Midnight received packs from its California manufacturing line. This establishes a company-reported aircraft installation; exact pack revision and current production configuration remain unverified. See aircraft profile.
These company development tests do not establish an FAA type certificate or approval of the current battery configuration.
Original manufacturer release. Archer releases: 31 January, 28 March and 8 May 2024. Reviewed 7 November 2026.
Original manufacturer release. Archer releases: 31 January, 28 March and 8 May 2024. Reviewed 7 November 2026.
Original manufacturer release. Archer releases: 31 January, 28 March and 8 May 2024. Reviewed 7 November 2026.
Reviewed developments appear here when available. Browse news coverage and the certification tracker for further evidence.