Midnight

12 propellers (Distributed Electric Propulsion): 6 tilt-propellers (5 blades each) for vertical lift and forward cruise, plus 6 fixed propellers (2 blades each) dedicated to vertical flight only.

Midnight

Propulsion Unit Count

12

Redundancy Approach

12 electric motors across 6 independent battery packs, with no single critical point of failure.

Range / Speed

Company-published: up to 100 mi range; up to 150 mph. Optimized for repeated ~20 mi missions. Capacity: 1 pilot + 4 passengers.

Seat Count

4

Last Updated

November 20, 2026

PROGRAM INTELLIGENCE DOSSIER

Current state & next gate

Lifecycle phase
Certification
Operating state
PRE-EIS
Current assessment

Archer reports FAA Phase 3 closed in April 2026 and Phase 4 compliance demonstration is under way. On 9 November Archer reported receiving an FAA Market Survey Special Airworthiness Certificate for Midnight for planned Los Angeles activity. The exact issue date and operating limitations were undisclosed. FAA Type Certification remains outstanding.

Next gate

Execute and close the remaining FAA Phase 4 compliance demonstrations, tests and analyses required for Type Certification.

AIRCRAFT & SYSTEMS

Technical overview

Midnight is Archer Aviation’s piloted, four-passenger electric vertical-takeoff-and-landing aircraft. It uses a winged distributed-electric-propulsion configuration intended for repeated short urban missions.

PropulsionWatch classifies Midnight as certification-stage and PRE-EIS: FAA compliance demonstration is active, while separate UAE activity provides an additional restricted-certification and operational pathway.

Configuration & architecture

Midnight uses 12 electric propellers: six tilting five-blade propellers used in vertical and forward flight, plus six fixed two-blade lift propellers used for vertical flight. Archer describes six independent battery packs and 12 electric motors.

Company-published targets include up to 100 miles of range and up to 150 mph, with the aircraft optimized for repeated missions of roughly 20 miles. These are manufacturer figures rather than certified operational minima.

PROGRAM EXECUTION

Development, test & industrialization

Archer reported in May 2026 that FAA Phase 3 of its four-phase Midnight Type Certification process had closed in April. Phase 4, formal compliance demonstration through testing and analysis, was already under way. The company has continued piloted flight-test and city-to-city operations in preparation for eIPP activity.

Those flight operations do not substitute for Type Certification. Archer’s eIPP preparations and the UAE restricted-certification pathway are separate regulatory routes from the FAA Type Certificate sought for widespread U.S. commercial service.

Archer's 23 October 2026 announcement identifies proposed sites for Midnight networks around Austin, Dallas–Fort Worth and Houston. The company projects 10–20 minute airborne journeys on selected links. Site readiness, permission for intended operations and FAA Type Certification remain separate gates.

Archer reported on 9 November that the FAA had issued a Market Survey Special Airworthiness Certificate for Midnight. Archer expected Los Angeles operations in the following weeks. The release did not reproduce the certificate, issuance date or operating limitations. FAA Type Certification remains a separate gate.

Operations & market

Archer has announced airline, defense and international operating relationships and is developing launch infrastructure and operating capability. PropulsionWatch separates those commercial preparations from certified passenger entry into service.

29 October 2026: Archer and ITA Airways announced a partnership to explore a Midnight air-taxi network in Italy. ITA’s contribution focuses on the passenger journey and airline-network integration, alongside specialist operating partners. Conditional agreements, aircraft approvals and service permissions remain separate gates; no aircraft quantity or start date is established by the announcement.

Open gates & dependencies

Documented dependencies include completion of FAA Phase 4 compliance demonstration, regulator verification and type certification, followed by the production and operating approvals applicable to the intended service. Market-specific approvals remain separate.

EVIDENCE LEDGER

Sources & evidence reviewed

Manufacturer / investor release — 11 May 2026: Archer Q1 2026 results reporting closure of FAA Phase 3 and ongoing Phase 4 compliance testing. Source.

Manufacturer / investor release — 10 Aug 2026: Archer Q2 2026 results reporting piloted city-to-city Midnight flights and eIPP readiness work. Source.

Evidence classification: FAA-phase progress is company-reported; Type Certification remains outstanding.

Archer — ITA Airways Italy partnership, 29 October 2026. Reviewed 29 October for commercial-planning scope only. Existing certification status and evidence-review date retained.

Archer Q3 results — 9 November

November 20, 2026

Compare tracked aircraft →

What changed?

Reviewed developments appear here when available. If this timeline does not load, use the linked program evidence above.

Continue research

Put this aircraft in context