Embraer-backed eVTOL developer flight-testing the Eve 100 under an ANAC-led certification program with FAA and EASA validation work.

Propulsion Architecture
All-electric lift+cruise design with eight dedicated lift rotors, fixed wings and a separate rear pusher propulsion system with dual electric motors.
Primary Certification Context
ANAC eVTOL
Strengths
ANAC accepted Eve's type-certificate application in 2022 and published final airworthiness criteria in 2024. In 2026 Eve advanced a full-scale flight-test campaign, completed a first partial transition flight, and applied to begin EASA validation. Embraer's certification and support infrastructure is a material program resource.
Primary sources: Eve certification update, July 2026; transition-flight update, August 2026.
Weaknesses / Open Questions
No type certificate has been issued. The 100 km range and future six-passenger autonomous configuration are company design targets, while Eve's June 2026 filing moved expected commercialization to 2028. The next evidence is completion of transition testing, conforming-aircraft production and regulator-accepted compliance work.
Last Updated
September 14, 2026
Eve 100 · Supplier selections. Eve named Nidec Aerospace for electric propulsion, BAE Systems for energy storage and DUC Hélice for rotors and propellers. Eve, 18 June 2023.
In a later announcement Eve identified Nidec for lifter motors and selected BETA for pusher motors for conforming prototypes and production aircraft. The production scope is an agreement, not evidence of completed deliveries. Eve, 2 December 2025.
Electrical distribution. Eve selected ASE for high- and low-voltage distribution and the DC-DC converter. Eve, 21 July 2024.
Company-reported. Sources checked 27 October 2026.
Reviewed developments appear here when available. Browse news coverage and the certification tracker for further evidence.