← All propulsion products

Airlander 10 500 kW motor

Collins Aerospace
View manufacturer company profile
Electric motors and engines
Documented propulsion or supporting hardware
Collins confirms a physical first prototype 500 kW motor for Hybrid Air Vehicles Airlander 10 on its electrification page.
Manufacturer-documented product or development; exact supplied configuration and installation approval require verification.

Specifications and conditions

Evidence review status: Primary-source review; model and configuration limits retained.

Operating limits: Collins confirms a physical first prototype 500 kW motor for Hybrid Air Vehicles Airlander 10 on its electrification page. Exact operating-point, mass, duty and availability not established by this overview. Historical prototype status; programme target dates are not treated as achieved.

Source conflicts / limitations: Primary documentation establishes electric-aircraft application or development. This is aviation-adjacent evidence, not a verified UAM installation. No missing value is treated as zero, no dielectric test voltage is treated as operating voltage, and no electrical input power is converted to shaft output.

Specification version / evidence: Original source linked below; reviewed 8 November 2026. Exact dated revision is noted above where established.

Aircraft applications

Primary documentation establishes electric-aircraft application or development. This is aviation-adjacent evidence, not a verified UAM installation. Collins confirms a physical first prototype 500 kW motor for Hybrid Air Vehicles Airlander 10 on its electrification page. Exact operating-point, mass, duty and availability not established by this overview. Historical prototype status; programme target dates are not treated as achieved.

Airlander 10 electric-propulsion development — source-specific configuration and development context.

Certification

See model-specific source and limitations. Special conditions, environmental tests, transport tests, supplier qualification claims and development milestones do not themselves establish an aircraft type certificate or approval of an exact installation.

Sources

Primary documentation. Reviewed 8 November 2026; scope and limitations above.

Last verified

November 8, 2026

What changed?

Reviewed developments appear here when available. Browse news coverage and the certification tracker for further evidence.