← All propulsion products

EcoPulse 800 V propulsion battery

Airbus
View manufacturer company profile
Batteries and battery management
Battery / energy-storage hardware
Airbus-designed 800 V DC battery capable of up to 350 kW, flown on EcoPulse hybrid-electric demonstrator.
Historical / demonstrator record; current availability and approval require verification.

Specifications and conditions

Evidence review status: Primary-source review; model and configuration limits retained.

Operating limits: Airbus-designed 800 V DC battery capable of up to 350 kW, flown on EcoPulse hybrid-electric demonstrator. About 50 hybrid test flights/100 hours across campaign, completed 2024. Voltage is nominal/rated context, not full compatibility interval; no pack energy or peak duration established.

Source conflicts / limitations: Primary documentation establishes electric-aircraft application or development. This is aviation-adjacent evidence, not a verified UAM installation. No missing value is treated as zero, no dielectric test voltage is treated as operating voltage, and no electrical input power is converted to shaft output.

Specification version / evidence: Original source linked below; reviewed 8 November 2026. Exact dated revision is noted above where established.

Aircraft applications

Primary documentation establishes electric-aircraft application or development. This is aviation-adjacent evidence, not a verified UAM installation. Airbus-designed 800 V DC battery capable of up to 350 kW, flown on EcoPulse hybrid-electric demonstrator. About 50 hybrid test flights/100 hours across campaign, completed 2024. Voltage is nominal/rated context, not full compatibility interval; no pack energy or peak duration established.

EcoPulse — source-specific configuration and development context.

Certification

See model-specific source and limitations. Special conditions, environmental tests, transport tests, supplier qualification claims and development milestones do not themselves establish an aircraft type certificate or approval of an exact installation.

Sources

Primary documentation. Reviewed 8 November 2026; scope and limitations above.

Last verified

November 8, 2026

What changed?

Reviewed developments appear here when available. Browse news coverage and the certification tracker for further evidence.