Volant VE25-100

Battery-electric winged eVTOL with eight electric motors for vertical takeoff and wing-borne cruise.

Volant VE25-100

Propulsion Unit Count

8

Redundancy Approach

Volant describes eight electric motors and a multi-redundant propulsion system, including reported single-rotor-failure test scenarios. Certification-level common-mode and system-safety detail remains subject to CAAC evidence.

Range / Speed

Manufacturer-published current figures: 200–400 km flight range, 235 km/h cruising speed, 2,500 kg MTOW, 500 kg commercial payload and six seats. Final delivered specifications remain subject to the approved configuration.

Seat Count

6

Last Updated

September 19, 2026

PROGRAM INTELLIGENCE DOSSIER

Current state & next gate

Lifecycle phase
Certification
Operating state
PRE-EIS
Current assessment

VE25-100 is in active CAAC type certification. Volant reports that the G-1 certification basis and project-specific certification plan were completed in April 2025, followed by development-batch aircraft flight testing, piloted flight and transition testing. No Type Certificate has been identified.

Next gate

Complete conformity and CAAC compliance demonstrations under the project-specific certification plan on the certification configuration.

AIRCRAFT & SYSTEMS

Technical overview

VE25-100 is a six-seat winged battery-electric VTOL aircraft aimed at regional and intercity passenger transport. Volant’s current material describes eight electric motors and a 200–400 km range, with 2,500 kg MTOW and 500 kg commercial payload.

The program remains PRE-EIS. Those figures are manufacturer-published and no CAAC Type Certificate has been identified.

Configuration & architecture

Volant’s current aircraft material describes eight electric motors in a distributed propulsion architecture for vertical takeoff and wing-borne cruise. The company also describes multi-redundant propulsion and reports single-rotor-failure test scenarios.

PropulsionWatch treats those statements as manufacturer evidence; the complete certification-level common-mode, battery and failure-containment architecture remains subject to regulator-verifiable evidence.

PROGRAM EXECUTION

Development, test & industrialization

CAAC East China accepted the VE25-100 Type Certificate application in September 2023, and the first certification review meeting followed in October 2024. Volant states that the G-1 certification basis was established and the project-specific certification plan signed in April 2025.

AC101, the first development-batch aircraft, rolled out in May 2025. Volant subsequently reported unrestricted free flight, piloted flight, airworthiness-review activity, powerplant and full-aircraft wind-tunnel testing, and a piloted transition flight. These are development and compliance-building milestones; no issued Type Certificate has been identified.

Operations & market

The intended market is piloted regional and intercity passenger transport. Orders, cooperation agreements and demonstration activity are not evidence of entry into commercial service.

Open gates & dependencies

Public evidence still needs to establish the final certification design and regulator-accepted compliance results. Production approval, individual-aircraft airworthiness and operator authorization would remain separate gates.

EVIDENCE LEDGER

Sources & evidence reviewed

Volant VE25-100 product page — reviewed 19 Sep 2026: six seats, 2,500 kg MTOW, 500 kg commercial payload, 200–400 km flight range, 235 km/h cruise speed and program chronology through 2026. Source.

Manufacturer program page — reviewed 19 Sep 2026: eight electric motors, multi-redundant propulsion and reported piloted/transition testing. Source.

Evidence boundary: company-published performance and test claims are not certified performance; G-1 and the project-specific certification plan are not a Type Certificate.

September 19, 2026

Compare tracked aircraft →

Continue research

Put this aircraft in context