All-electric conventional-takeoff two-seat trainer using a single 125 kW electric motor in a composite airframe.

Propulsion Unit Count
1
Redundancy Approach
Certification-level system redundancy should be taken from the FAA compliance record rather than inferred from the single-motor configuration; current public company material emphasizes motor simplicity and accepted design/test plans.
Range / Speed
Current company material emphasizes the 125 kW propulsion motor and training mission; PropulsionWatch has not normalized range/speed here without a current certification-basis source.
Seat Count
2
Last Updated
September 25, 2026
AOPA and AIN report the full-scale prototype first flew on 17 September 2026 under experimental airworthiness authority. Company announcements followed on 24/25 September. Bye is evaluating Part 22 alongside prior Part 23 work; no aircraft approval is established.
Expand the flight envelope and move from development flying to FAA-witnessed compliance testing.
eFlyer 2 is a two-seat all-electric trainer being developed by Bye Aerospace for FAA Part 23 certification.
Bye currently advertises a single 125 kW electric motor, composite airframe and Garmin avionics for the eFlyer training platform.
magniX Samson300 batteries powered the eFlyer 2 prototype’s first flight in September 2026, according to the supplier. Flight testing does not establish aircraft or battery approval.
Rolls-Royce reported flight tests of an earlier 70 kW demonstrator EPU from 2019. This is a historical configuration and should not be assumed to describe the later aircraft.
AOPA’s 22 October 2026 report with a CEO interview dates the first flight to 17 September, matching AIN. The previous 24 September occurrence claim was an announcement-date inference. The original flight log was not reviewed.
Part 23 work remains relevant, while the company is studying whether Part 22 can use some of that work. No final pathway selection or delivery approval is inferred.
The intended market is flight training, where Bye positions electric propulsion around lower operating cost, noise and maintenance burden.
Experimental authorization is not aircraft type certification. Reviewed 28 October 2026: Bye’s product page lists 125 kW, while Safran’s 25 September release describes ENGINeUS 100 takeoff power above 180 kW. The exact installed variant, rating conditions and reason for the difference are not publicly established by these sources. The 125 kW field is a manufacturer product-page reference, not a verified installed prototype rating. ENGINeUS 100 B1 approval must not be transferred to eFlyer 2 without a confirmed variant match.
September 25, 2026
Reviewed developments appear here when available. If this timeline does not load, use the linked program evidence above.