Battery-electric tilt-propeller eVTOL using vertical takeoff and wing-borne cruise; final certification-system detail is only partly public.

Propulsion Unit Count
Redundancy Approach
Distributed electric propulsion is evident from the configuration; aircraft-specific certified redundancy detail remains insufficiently public.
Range / Speed
Manufacturer-published current figures: 200 km range and 230 km/h cruise speed for the AE200 series; figures are reported under test conditions and are not certified performance.
Seat Count
6
Last Updated
September 19, 2026
AE200-100 remains in active CAAC type certification. Aerofugia reports that the first production-intent aircraft rolled out in September 2025 and completed first-stage verification flying in December 2025. The company continues to target 2026–2027 for Type Certificate completion; no issued Type Certificate has been identified.
Complete the remaining CAAC conformity and compliance-verification program on the production-intent AE200-100 configuration and obtain the regulator's findings of compliance.
AE200-100 is Aerofugia’s six-seat battery-electric eVTOL for passenger transport. The aircraft uses tilting propulsors for vertical flight and wing-borne cruise.
PropulsionWatch classifies the program as certification-stage and PRE-EIS. Public flight demonstrations and transition flights are development evidence, not approval.
Available first-party evidence supports a six-seat, winged, tilt-propeller configuration. Public detail is not sufficient to state the final propulsion-unit count, battery topology or certification-level redundancy architecture without qualification.
Manufacturer performance numbers are therefore treated as targets rather than certified capability.
Aerofugia states that the AE200-100 certification project began after its Type Certificate application was accepted in 2022. The company reported completion of the full-scale, full-weight transition-flight test program in June 2024 and later defined a production-intent configuration.
The first production-intent AE200-100 rolled out in September 2025 and completed first-stage verification flying in December 2025. Aerofugia is also progressing a parallel Production Certificate process; approval of production-quality-system documentation is a PC-process milestone, not issuance of a Production Certificate. The company continues to state a 2026–2027 Type Certificate target.
Aerofugia positions AE200-100 for urban and regional passenger missions. Demonstrations and customer or ecosystem agreements do not establish commercial service.
The decisive remaining evidence is the CAAC-approved certification configuration and completed compliance record. Conformity, systems safety, propulsion and battery qualification, production approval and operating permissions remain separate dependencies.
Manufacturer AE200-100 program page — reviewed 19 Sep 2026: 3–6 seats, 200 km maximum range, 230 km/h cruise speed, certification chronology, September 2025 production-intent rollout and December 2025 first-stage verification flight. Source.
Manufacturer PC-process update — 7 Aug 2025: production-quality-system documents approved by the PC review team; production-system trial operation and on-site review remained subsequent steps. Source.
Evidence boundary: the 2026–2027 Type Certificate timing is a company target; verification flights and PC document review are not Type Certificate or Production Certificate issuance.
September 19, 2026
Reviewed developments appear here when available. If this timeline does not load, use the linked program evidence above.